- Conclusion of a contract with the general designer for design and survey works
- Performing survey work if necessary
- Performing survey work if necessary
- Development of an architectural project in accordance with TKP 45-1.02-295-2014 “Construction. Design documentation. Composition and development order ”
- Approval of the project with state and local government bodies if there are deviations from the tnpa and technical conditions
- Coordination of the project with the territorial division of architecture and urban planning
- Obtaining the conclusion of the state examination of the project, if necessary
- Approval of an architectural design
- Conclusion of a contract for the implementation of architectural supervision, if it is not included in the main design contract
- Development of a construction project as a whole for an object or for construction phases (with the allocation of launch complexes)
- Registration of the declaration of conformity of design documentation
- Construction and installation work