investment proposals
database / investor's
roadmap interactive
portal
Интерактивный портал
Дорожная карта инвестора
  • Why Belarus?
  • Investment opportunities
    • Investment Proposals Database
    • Public Private Partnership
    • Sector Overviews
    • Property for sale and rent
  • Business Environment
    • Preferencial Regimes
    • Tax System
    • Legal Framework
    • Guide to investment
    • Our-partners
  • NAIP and what we do
    • Our Services
    • Structure
    • Events
    • FIAC
    • The international cooperation
  • News
    • News
    • Newsletter
  • Contacts
  • Forgot your password?
Main>List of land plots for investors>Brest region
mail@investinbelarus.by

Newsletter

Here you can subscribe to our quarterly newsletter.


List of land plots

Brest region

Baranovichi city
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Sovetskiy ave. 1,2 (1 of which - for area development) construction of a hotel complex (current low-rise accommodations are subject to removal) electricity line and low pressure gas pipeline ø114 mm (along the Dubrovskogo lane); driveway 497,72
2 Sovetskiy ave. 1,5 (building line is to be 5 m from the red line of Sovetskogo ave.) construction of a multifunctional building for a business center (current low-rise accommodations are subject to removal) sewer system ø200 mm, water pipeline ø20 mm, low pressure gas pipeline ø50 mm and ø114 mm; low pressure (ø100 mm) and medium pressure (ø500) mm gas pipelines (along the Shevchenko str.); driveway 649,2
3 Badaka str. 2,4 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline ø219 mm, water pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 150 m; there is a railway to the west of the plot, construction of new approach lines is possible 413,28
4 Badaka str. 0,8 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline ø219 mm, water pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 200 m 137,76
5 Badaka str. 0.8 construction of operation support facilities at an industrial enterprise of the fifth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline ø219 mm, water pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, driveway 137,76
6 Badaka str. 0,8 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline ø219 mm, water pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 50 m 137,76
7 Badaka str. 0,8 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline ø219 mm, water pipeline ø100 mm and ø200 mm, sanitary sewer system ø500 mm, distance to the Badaka street is about 100 m 137,76
8 Slonimskoye Highway St., 5A 3,7 for allocation of a production area and warehouses of the logistic center the asphalted street, water supply, power supply, gas supply abscent 408,85
9 Zelenaya str, 7 0,37 For a placement of the public building (hotel 2-4 floors) with a condition of land seizure in order to establish it by the legislation and demolition, located on them, an individual house on Zelyonaya St., 5, and a garage on Zelyonaya St., 9 the asphalted street, water supply, power supply, gas supply abscent 236,652
10 Kommunisticheskaya St. 0,3 For the construction of the facility on rendering services It is necessary to coordinate connection to networks of 10 kV (0,4 kV) with RUP BPHO, from networks of a power supply system – it is necessary to lay 2 KL-10 kV from PS of 110 kV of HBK with the construction of TP. It is necessary to lay the area of water supply system about 470 m long network of a water supply system of 200 mm on the Gayeva St. the network of a water supply system of 200 mm on Masherov Avenue (about 470 meters from the land plot). It is necessary to design and lay the area of sewerage network about 700 m long from the area to the collector of 200 mm at. Gayevy (700 meters from the land plot). The gas pipeline on average pressure diam.159 mm (105 meters from the land plot). abscent 97,375
11 Fabrichnaya St. 6,7 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) It is necessary to install two cells of 10 kV with switching devices on PS 110 For a construction of production base of industrial enterprise of the fourth class quarter Zapadnaya, to lay two KL-10 kV, RP construction (range – near 3.6km). It is necessary to lay network of a water supply system about 2 km long on the Francis Scorina Street (from network of a water supply system of 200 mm on Professionalnaya St. to network of a water supply system of 150 mm on Brestskaya St., 295). Range about 2 km. Gas pipeline of average pressure 63 of mm upon the lane 1 Suburban and lane 2 Suburban, gas pipeline of average pressure 133 of mm and 108 mm upon a boiler room of treatment facilities. abscent 1871,98
12 Brestskaya St., 315 7,1 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) It is necessary to install two cells of 10 kV with switching devices on PS 110 For a construction of production base of industrial enterprise of the fourth class quarter Zapadnaya, to lay two KL-10 kV, RP construction (range – near 3.6km). It is necessary to lay network of a water supply system about 2 km long on the Francis Scorina Street (from network of a water supply system of 200 mm on Professionalnaya St. to network of a water supply system of 150 mm on Brestskaya St., 295). Range about 2 km. Gas pipeline of average pressure 63 of mm upon the lane 1 Suburban and lane 2 Suburban, gas pipeline of average pressure 133 of mm and 108 mm upon a boiler room of treatment facilities. abscent 830,7
13 Francis Scorina St., 41 4 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) At a distance of about 20m is pressurized sewer d200 (south-eastern side of the plot), a distance of about 30m and 70m is heating main d100 and plumbing d150 (west side of the plot), along the western side of the plot takes place 10 kV power network (100m - TA), a distance of about 110 m diameter water pipe network passes. Entrance to property provided by the existing street network ul.Slonimskoe highway abscent 468
14 Slonimskoe Shosse str. 5 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) electricity line (along the Pushkina str.), sewer system d250 mm, water pipeline d200 mm and medium pressure gas pipeline d250 mm (along the Sovetskaya str.), water pipeline d150 mm (along the Baranova str.), driveway abscent 942
15 Sovetskaya, Baranova, Dzerzhinskogo and Pushkina streets 2,1 construction of an elite house of enhanced comfort and with public service facilities (current accommodations, car fleet buildings and constructions are subject to removal) abscent 1485,12
16 Sovetskaja, Mitskevicha and Gagarina streets 0,7 construction of elite housing, a shopping center, a hotel, public catering facilities (a bar, restaurant, cafe), current accommodations and accessory buildings removal electricity lines and low pressure gas pipeline d100 mm, low pressure gas pipelines d89 mm (along the Gagarina str.), pipeline d150 mm (along the Sovetskaya, gagarina and Mitskevicha streets), sewer system d150 mm (along the Mitskevicha str,), d200 mm (along the Gagarina str.), driveway abscent 491,66
17 Sovetskiy ave. 0,5 culture and entertainment center (number of stories - up to 3, planting area is not less than 25%) sewer system d300 mm and water pipelines d800 mm (along the Sovetskogo ave.), low pressure gas pipeline d108 mm at a distance of 200 m, cabel power line - eastern side of the plot. driveway abscent 269,3
18 Voikova, Timiryazeva and Sverdlova streets 2,5 construction of a multifunctional entertaining center (current low-rise accommodations and administrative buildings are subject to removal planting area is not less than 25% of the territory), there is an electricity line (Voikova and Sverdlova streets), 3 power lines on the plot, water pipeline d150 mm (along Voikova str.), water pipelines d150 mm and d400 mm (along the Smolenskaya str.), water pipeline d100 mm (along the Timiriazeva str.), sewer system d1000 mm and ?500 mm (along the Baranova str.), low pressure gas pipelineа d114 mm (along the Timiriazeva str.), driveway abscent 1683,25
19 Voikova, Smolenskaya and Sverdlova streets 1,9 construction of a sports and recreation center (current low-rise accommodations and administrative buildings are subject to removal, planting area is not less than 25% of the territory) electricity line, water pipeline ?150 mm (along the Voikova str.), water pipeline ?200 mm (along the Baranova str.), water pipeline d150 mm and ?400 mm (along the Smolenskaya str.), water pipeline ?100 mm (along the Timiriazeva str.), sewer system ?1000 mm and ?500 mm (along the Baranova str.), medium pressure gas pipeline ?300 mm, driveway abscent 1288,39
20 Vostochniy poselok str. 1,3 construction of a machine building plant power transmission line, water pipeline d200 mm and high pressure gas pipeline d500 mm (along the Frolenkova street), water pipeline d500 mm (along the Kabushkina str.), driveway by the current road network, construciton of a driveway to the Churilina str. 450 m in length is possible abscent 350,61
21 Badaka str. 0,8 construction of operation support facilities at an industrial enterprise of the fourth class (by sanitary classification) three cable power lines (along the Badaka street), medium pressure gas pipeline d219 mm, water pipeline d100 mm and d200 mm, sanitary sewer system d500 mm, distance to the Badaka street is about 160 m abscent 137,76
Baranovichi district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Velikoloukskiy village council, Rusino agro-town, 7, Solnechniy lane 0,3 a retail facility construction road, electricity transmission line, all the utilities are in close proximity abscent 3,338
Bereza district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 the Striginsky village council, to the west of the village Peresudovichi 15 mixed trade industry electricity lines 10 kV and 110 kV, north side of the plot, low pressure gas pipeline (d63 mm) and cable power line (along the motor road to the Olshevo village), water pipeline d150 mm (100 m to the east), 200 m south-east, storm water sewage (d900 mm), transport connection: motor road abscent 0,44
Brest city
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Brest, Respubliki Avenue 25 construction and service of a multipurpose object connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent no information
2 Brest, in the area of the Kamenetsky roadring in the territory of water intake «Northern» the 3rd rise 2,7 construction of the logistic center connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent no information
3 Brest, the quarter limited Mickiewicz St., Komsomolskaya St., Sovietskaya St. and Pushkinskaya St. 0,7 construction and servicing of administrative and business, residential and mall center. connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 1430192,75
4 Brest, on the cross of Writer Smirnov St. and the highway M1/E30 6 facility construction of roadside service and logistic center connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 1512,6
5 Gavrilova str. 0,5 reconstruction of sports and recreation center (leisure component is to be constructed) connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 5,27
6 Lutskaya str. up to 1 construction and maintenance of a bathing center (Russian bath) connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent no information
7 39, Dzerzhinskogo str. 96,98,100,102/1, Sovetskaya str. 0,5 construction of a building for administrative and retail purposes, with possibility of developing residential accomodation connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 974,95
8 the district within the confines of Masherova ave., 48, 50, Ostrovskogo and Sovetskaya streets up to 1 construction and maintenance of a multifunctional center connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 2007,7
9 the quarter within the confines of Kizhevatova, Sportivnaya and Respublikanskaya streets 3 construction and maintenance of a group of buildings for accomodation, retail and leisure, administrative and office purposes, and the use as a hotel connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 5416,5
10 at the intersection of Moskovskaya and Pionerskaya streets up to 1,5 construction and maintenance of a group of buildings for accomodation, retail and leisure, administrative and office purposes, and the use as a hotel connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 2296,65
Brest district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 0.5 km to the north-east of the township Domachevo 1 for construction of public and business facilities electricity line 10 kV, unsurfaced road abscent no information
2 0.1 km to the east of Leplevka village 0,5 for construction of operation support facilities electricity line 10 kV, unsurfaced road abscent no information
Drogichin district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Drogochin, 9th of May str. 0,99 construction and maintenance of a building for services provision and trade in non-food group of goods possibility of connection to the operating utilities (gas, heat, water and electricity supply, sewerage, driveway to the plot) abscent 9,4
2 Drogichin, Lenin St. (area of Open JSC Ekzon) 0,5 industrial facility (production of medicines) possibility of connection to power transmission line, water pipeline, gas pipeline, sewerage abscent 192,8
3 Nagornoe village, Zheleznodorozhnaya str. 1,1 industrial facility possibility of connection to power transmission line, water pipeline, gas pipeline, sewerage abscent 35,8
4 Drogichin, 204, Lenin str. (Republican Unitary Enterprise «Ekzon-Glyukoza» area) 3,15 industrial facility possibility of connection to power transmission line, water pipeline, gas pipeline, sewerage abscent 8,4
5 intersection of roads: border with Russia – Gomel – Kobrin (М10) and motor road Drogichin–Bereza (R84) 0,2 roadside service facility possibility of connection to power transmission line, asphalt driveway is available, proximity of international and republican subordinance roads abscent 222,74
Gantsevichi district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Gantsevichi town, 14, Promyshlennaya str. 0,2 manufacturing facility paved street, water supply, electricity and gas supply abscent 57,95
2 Gantsevichi town, Stroiteley str.,6 0,4 for construction and service of the trading facility paved street, water supply, electricity and gas supply abscent 64,6
3 Gantsevichi town, 12, Promyshlennaya str. 1,1 manufacturing facility paved street, water supply, electricity and gas supply abscent 11,7
4 Gantsevichi town, 10, Promyshlennaya str. 0,2 manufacturing facility paved street, water supply, electricity and gas supply abscent 11,7
5 Gantsevichi town, 8, Promyshlennaya str. 0,2 manufacturing facility paved street, water supply, electricity and gas supply abscent 11,7
6 Gantsevichi town, 65C, Matrosova str. 0,2 manufacturing facility paved street, water supply, electricity and gas supply abscent 47,87
7 Gantsevichi town, 65R, Matrosova str. 0,4 manufacturing facility paved street, water supply, electricity and gas supply abscent 43,5
Ivanovo district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Ivanovo town, Polevaya str. (adjoins the OJSC «Belsolod» area) 2 for allocation of industrial and service provision facilities connection to electricity and water supply is possible, adjoins the asphalt road abscent 207,2
Ivatsevichi district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Ivatsevichi town, Zavodskaya str. 1 construction of a manufacturing facility (sanitary protection zone, 50 m) abscent 127,8
2 Ivatsevichi town, Zagorodnaya str. 1,5 construction of a manufacturing facility (sanitary protection zone, 50 m) abscent 151,05
3 Ivatsevichi town, 1, Zagorodnaya str. 1 construction of a manufacturing facility (sanitary protection zone, 50 m) abscent 123,3
Kamenets district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 to the northeast of Vysokoe town 3 construction of an industrial facility 50 m; road, power transmission line 10,2
2 to the southwest of Melniki village 8,4 agri-eco-tourist center 50 m; road, power transmission line 22,635
3 southeast outskirts of Kamenets town 5 construction of an industrial facility 500 m to the northeast of Dzerzhinskogo street; road, power transmission line 218,5
Kobrin district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 1.5 km to the south of Borisovo village 10 construction and maintenance of a logistics center possibility of installing electricity, gas supply, asphalt driveway, motor road Kobrin-Divin-border with Ukraine is in close proximity no information
2 to the west of mobile mechanical division No. 57 at Proletarskaya str., Kobrin town 3 construction of a manufacturing facility possibility of installing electricity, water and gas supply, asphalt driveway, railway Brest-Gomel is in close proximity no information
3 Kobrin town, Kalinina str. 0,8 construction of a manufacturing facility possibility of installing electricity, water and gas supply, asphalt driveway abscent no information
4 Kobrin town, Severnaya str. 6 construction of a manufacturing facility possibility of installing electricity, water and gas supply, asphalt driveway, railway Brest-Gomel is in close proximity abscent no information
Louninets district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Mikashevichi town, 14, Sadovaya str. 0,08 construction of a touch-free car wash possibility of connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) abscent 4,5
Lyakhovichi district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Rusinovichi agro-town 3 allocation of a logistics center, a manufacturing facility electricity, asphalt driveway, 0.1 km from the railway abscent 11,4
2 Lyakhovichi, 144, Oktyabrskaya str. (behind the territory of CJSC «Lyakhovichskiy Plastic-to-Metal Seal Plant») 2 allocation of a manufacturing facility electricity, driveway by the existent road network (asphalt and unsurfaced road), 0.3 km from the railway abscent 151,4
3 Lyakhovichi, 15, Trudovaya str. (behind the production facilities of State Unitary Manufacturing Enterprise «Lyakhovichskoe PMS» (PMS - plant for reclamation works) 2,5 allocation of a manufacturing facility electricity, driveway by the existent road network (asphalt and unsurfaced road), 0.2 km from the railway abscent 193,75
4 Lyakhovichi, 1, Vishnevaya str. (building estate ќ«Potapovichi») 0,4 a retail facility construction utilities under construction (electricity, water pipeline, gas), asphalt driveway abscent 89,24
Malorita district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Malorita town of the 8th March str. (opposite to base) 0,3 allocation of a manufacturing facility Water supply, gas supply, power supply, entrance to the area. abscent 6,67
2 Sovetskaya St. of 131/1 Malorita town 0,3 allocation of a manufacturing facility water supply - on Sovetskaya St., gas supply - on Sovetskaya St., power supply - on Sovetskaya St., an entrance to the site - adjoins Sovetskaya St. abscent 5,05
3 2 km to the east of Soushitnitsa village (former manufacturing area) 11,6 allocation of a manufacturing facility water, gas and electricity supply are not available – input from the Soushitnitsa village is possible, driveway to the plot – a motor road with asphalt and gravel covering abscent 0,13
4 0,6 km to the southwest Velikorita, near the existing MTF APO Rita 2,8 allocation of a manufacturing facility water supply – the well of APO Rita, gas supply – isn't present (gas in аг. Velikorita), power supply – TP APO Rita, an entrance to the area – existing gravel motoway abscent 0,1
5 70 m to the west of Antonovo village, (former farm) 7,5 allocation of a manufacturing facility water supply – not available, making a well is necessary, gas supply – not available, electricity is to be supplied from the Antonovo village, driveway to the plot – gravel motor road abscent 0,13
6 50 m to the south of Zburazh village (former brick plant) 3,2 allocation of a manufacturing facility water supply from the township, possibility of making a well, gas supply from Zburazh village, electricity is to be supplied from the Zburazh village, driveway to the plot – asphalt road of the village, 150 m – construction of a driveway abscent 0,31
Pinsk city
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 10, Lenin sq 0,54 construction and maintenance of a multifamily house with trade and service enterprises, administration premises on the ground floor possibility of connection to existing engineering networks of gaz, water and power supply, driveway to the plot is possible through the operating road network demolition of houses and uninhabited structures 444,1
2 3, Gorkogo str., Kosmodem'yanskoy, Lenin sq. 0,54 construction and maintenance of a multifunctional complex for trade, cultural, and entertainment use (without the right of allocation of gambling objects) possibility of connection to existing engineering networks of gaz, water and power supply, driveway to the plot is possible through the operating road network demolition of houses and uninhabited structures 976,5
3 «Radouzhniy» building estate 0,2 construction of a multistorey car park with a service station and commerce facilities, removal of the residential houses is intended connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 93,6
4 within Chernyakhovskogo, Zheleznodorozhnaya and Medovaya streets 0,64 construction of a multifunctional business center with retail facilities and a hotel connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 620,4
5 8, Korzha str. 0,14 construction of a multifunctional business center with retail facilities and a hotel connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 143,9
6 69, Zholtovskogo ave. 2,1 construction of a supermarket with an area of up to 5000 m2 connection to the operating utilities (gas, water and electricity supply, driveway to the plot) is possible abscent 509
7 Zoi Kosmodemyanskoy str. 3,5 total reconstruction of a playground, construction of a children entertainment center and public catering and commerce facilities connection to the operating utilities (gas, water and electricity supply, sewerage, driveway to the plot) is possible abscent 3392,9
Pinsk district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 to the north-east of Zhabchitsy village, plot No.28 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
2 to the north-east of Zhabchitsy village, plot No.27 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
3 to the north-east of Zhabchitsy village, plot No.26 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
4 to the north-east of Zhabchitsy village, plot No.25 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
5 to the north-east of Zhabchitsy village, plot No.24 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
6 to the north-east of Zhabchitsy village, plot No.23 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
7 to the north-east of Zhabchitsy village, plot No.22 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
8 to the north-east of Zhabchitsy village, plot No.21 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
9 to the north-east of Zhabchitsy village, plot No.19 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
10 to the north-east of Zhabchitsy village, plot No.18 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
11 to the north-east of Zhabchitsy village, plot No.17 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
12 to the north-east of Zhabchitsy village, plot No.14 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
13 to the north-east of Zhabchitsy village, plot No.13 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
14 to the north-east of Zhabchitsy village, plot No.12 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
15 to the north-east of Zhabchitsy village, plot No.11 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
16 to the north-east of Zhabchitsy village, plot No.10 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
17 to the north-east of Zhabchitsy village, plot No.9 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
18 to the north-east of Zhabchitsy village, plot No.8 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
19 to the north-east of Zhabchitsy village, plot No.7 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
20 to the north-east of Zhabchitsy village, plot No.6 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
21 to the north-east of Zhabchitsy village, plot No.5 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
22 to the north-east of Zhabchitsy village, plot No. 4 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
23 to the north-east of Zhabchitsy village, plot No. 3 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent
24 to the north-east of Zhabchitsy village, plot No. 2 1 manufacturing facility possibility of connection to power transmission line, asphalt driveway is available abscent 4
Prouzhany district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Prouzhany town, Makarenko str. 0,7 services sanitary sewer system Ø200, water pipeline Ø100 (along the Makarenko str.); medium pressure (Ø114) gas pipeline (180 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV 72,87
2 Prouzhany town, Makarenko str. 1,8 a manufacturing facility sanitary sewer system Ø200, water pipeline Ø100 (along the Makarenko str.); medium pressure (Ø114) gas pipeline (50 m away); distance to the Makarenko street is 220 m, to the railway station Oranchitsy - about 12 km; power line 10 kV 187,38
3 Prouzhany town, Internatsionalnaya str. 2,5 a manufacturing facility sanitary sewer system 300, water pipeline 300 (along the Internatsionalnaya str.); high and medium pressure (159, 152) gas pipelines (along the Zavodskaya str.); distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Pushkina street - 30 m; power line 10 kV 239
4 Prouzhany town, Makarenko str. 0,5 services sanitary sewer system d200, water pipeline d100 (along the Makarenko str.), medium pressure (d114) gas pipeline (50 m away), distance to the Makarenko street is 330 m, to the railway station Oranchitsy - about 12 km, power line 10 kV abscent 52,05
5 Prouzhany town, Internatsionalnaya str. 3 a manufacturing facility sanitary sewer system 300, water pipeline 200 (along the Internatsionalnaya str.), high and medium pressure (159, 152) gas pipelines (along the Zavodskaya str.), distance to the motor road R-85 is about 200 m, to the railway station Oranchitsy - about 12 km, to the Internatsionalnaya street - 80 m, power line 10 kV abscent 196,8
Stolin district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 Radchitsky Village Council, 0,5 km to the southeast Radchitsk 42,6 for building an installation of 30 MW power blocks in case to use renewables energy of the sun. The entrance is carried out on dirt road. The area is located in a security zone of the power line. East side of the area is 11 hectares in protective zone. abscent 80,94
2 Stolin, Mira ave. 0,2 for construction of a service provision facility sewerage system d150 mm, water pipeline d100 mm, electricity line 10 kV, medium pressure d63 and low pressure d89 gas pipelines (20 m away), driveway abscent 52,8
3 Stolin Tereshkovoy str. (within the area of the automobile park No.12) 1 for construction of an industrial facility water pipeline d150 mm (along R.Zorge str.), sewerage system d150 mm, electricity line 10 kV, high pressure d108 and medium pressure, d225 and d273, gas pipelines (10 m away), driveway abscent 113,6
4 Stolin, Tereshkovoy str. (within the road servicing department No.26) 1 for construction of an industrial facility water pipeline d150 mm (along Mira ave.), sewerage system d150 mm, electricity line 10 kV, high pressure (d219) and medium pressure (d32) gas pipelines (20 m away), driveway abscent 132,5
5 Stolin, Tereshkovoy str. (within the forestry area) 4 for construction of an industrial facility here are water pipeline d150 mm, sewerage system d150 mm, electricity line 10 kV along the Mira ave., high pressure (d219) and medium pressure (d32) gas pipelines (20 m away), driveway abscent 413,6
Zhabinka district
№ Location of the land plot Estimated area, ha Purpose of the land plot Engineering and transport infrastructure Existence of encumbrances Cadastral value of the plot, thousand USD
1 0.3 km to the west of Zhabinka, along the road Zhabinka-Rachki 3,5 production facility paved motor road, railway, electricity and gas supply abscent 32,55
2 Zhabinka Korotkina str. 1,6 production facility paved street, railway, electricity supply and gas abscent 14,69
3 to the west of Yezhyki village, Leninskiy village council 2,5 production facility gravel motor road, 1.5 km to the highway М-1/Е30, electricity supply abscent 5,75
4 to the south of Dyatly village, Rakitnitskiy village council 3,9 production facility asphalt motor road, electricity and gas abscent 9,4
mail@investinbelarus.by

Newsletter

Here you can subscribe to our quarterly newsletter.


Why Belarus?

  • News
  • Contacts

Investment Opportunities

  • Investment Projects
  • Public Private Partnership
  • Sector Overviews

Business Environment

  • Preferencial Regimes
  • Tax System
  • Legal Framework

NAIP and what
we do

  • Our Services
  • Structure
  • Events
  • FIAC

14 Bersona Street, Minsk, 220030

Phone: +375 17 200 81 75, +375 17 200 52 89

E-mail: mail@investinbelarus.by

!ДипПредставительства.png
logo_minec.jpg

© 2018 National Agency of Investment And Privatization

Developed by ArtisMedia